Requirements ============ **Released inputs from Engineering:** * Gerber/ODB++/drill data, stack‑up, impedance targets * Schematic (PDF), BOM (with manufacturer MPN & approved alternates), CPL/XY * Assembly drawings (top/bottom, polarities, special notes) * Test instruction (ICT/FCT), limits, fixture data * Programming package (HEX/BIN/ELF, offsets, fuses, bootloader, SN/calibration rules) * Labeling/marking data (SN, Data‑Matrix/QR) **Equipment/Software:** * Stencil printer + stencil, SMT pick‑and‑place, reflow oven * Selective/wave soldering (for THT) * AOI/microscope, X‑ray for BGA as needed * ICT/Flying Probe or bed‑of‑nails fixture, bench PSU with current limit, DMM, oscilloscope * Programmer (e.g., J‑Link, ST‑LINK, AVR‑ISP, PICkit, etc.) * ERP/MES/traceability system